redo insulation in partial log home | |
Contractor did not put plastic or sheeting before putting down foam insulation what is the best way to correct the situation. We had an audit and air is changing every hour in our home.
Answers:
From: Michael Peyser
i think the best way to have this corrected is to get the same contractor and let them redo it. that is the best way to deal with it.
Back
Add Your answer to this question: | |
|
|
 |
Powered by Yahoo! Answers
|